Melzo-Bari, 6 May confirmed departure 3 weekly circulations

Confirmation of the departure on a regular basis of the three weekly circulations that will link the RHM terminal in Melzo with the Scalo Ferruccio di Bari.
The pack wagon will allow the transport of any UTI type including P400 profile semitrailers. ADR and CER transport allowed.
This new report further strengthens the presence of GTS on the Adriatic axis by adding the 7 Piacenza-Bari, 6 Milan-Bari and 3 Bologna-Bari for a total of 19 pairs of weekly trains.
From Bari it is possible to embark its intermodal units for Greece, Turkey and Albania.

bari melzo GTS timetable



Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.